Level 9
Advanced workflows
Large changes need controlled interfaces and integration checks.
01Refactor without changing behavior12 min02APIs, data, and safe migrations12 min03Parallel work and code review12 min
LEVEL 09
Large changes need controlled interfaces and integration checks.